Back to the Boot Bench… Part 2

_DPP7005

Dovetails for the first corner

It’s been a few weeks since I last posted, but despite the radio silence I have been progressing the boot bench for our hall. The first task was to cut the dovetails which join the sides and top of the casework. I’ve written about my dovetailing process previously (and also here), and the internet probably doesn’t need another treaties on how to cut dovetails. So I shall spare you, dear reader, from having to read another account of the same process. Truth be told, the only changes I’ve made to how I dovetail in the four years since I took the Anarchist’s Tool Chest class with Chris is that I use a Moxon vise for holding the workpiece, and I use a Bad Axe Bayonet saw for dovetailing stock thicker than 1/2″ (for 1/2″ stock I use my original 10″ Bad Axe Doc Holliday dovetail saw).

_DPP7006

Cutting the pin board

The remaining dados in the top (to accept the vertical divider) and the divider (for the shelves), were cut in stages. First, I did a dry fit to check that the carcase went together without any issue, and then marked off the position of the dado in the top to accept the vertical partition. By measuring the location of the dado in the bottom shelf once the casework was assmbled I could ensure that the corresponding dado in the top would be in exactly the right location. With that dado cut, I inserted the vertical divider and then measure the position of the three dados for the shelves, double checking by measuring each dado from both the bottom and the top of the interior of the casework.

_DPP7189

Laying out the dado positions for the vertical divider

With the dados cut I then prepared the shelves to fit their respective dados. A final dry fit confirmed that all of the components were a snug fit and that the casework went together square and true. Glue-up can be stressful enough without having to wrestle multiple parts, and so I prefer to assemble casework in stages. The first stage for this project was the carcase – top, sides, and lowest shelf. I assembled the dovetails first, applying Old Brown Glue to all surfaces and then knocking them together with a 1lb lump hammer. I then sized the end grain of the lower shelf with glue, waiting a few minutes before applying glue to both dados before sliding the shelf in place. This was my first glue up using a flux brush to spread the glue (a tip Chris wrote about recently) and it worked very well for getting an even coat of glue.

_DPP7195

Drilling pilot holes through the vertical divider

The dados will be reinforced with cut nails. The dados in the carcase will be nailed once the glue cures, but there is not enough space inside the casework to drill pilot holes in the vertical divider once assembled. While the carcase was in the clamps I assembled the interior dry, and drilled pilot holes for the cut nails through the vertical divider into the shelves. Those pilot holes were angled in opposite directions to increase holding power. I have just enough space to use a hammer to knock these nails in when gluing the interior assembly, and by inserting the nails into the divider during glue-up they will help to keep the shelves aligned when sliding them into place.

_DPP7202

Next up will be to glue in the shelves and divider, fit the tongue-and-groove back, and finally dovetail the drawer. This project is coming together quite quickly.

IMG_1001

Dry fit and looking ok